HYBRIT Research project 1 has reached it’s end

Wednesday September 1st was a prominent day for HYBRIT’s Research project 1. It was time to present the results for a wider audience, at the ESTAD- conference hosted by Järnkontoret. There was a lot of interest with many interested listeners, particularly via the digital platform.

The project was introduced by Hybrit General Manager Eva Vitell, connecting the research to the fossil free value chain, and also made a concluding presentation. At the symposium representatives for RP1’s six work packages presented the over all results and conclusions on the different topics.

  • ”Fossil-free iron ore pellets production” was presented by Charlotte Andersson from LTU
  • “Hydrogen based iron ore reduction” was presented by Johan Riesbeck, Hybrit Development AB
  • ”Steelmaking from hydrogen reduced iron” was presented by Carl Allertz, SSAB
  • ”Providing energy for fossil-free steel production and the effects on the electrical power system” was presented by Tobias Rehnholm, Vattenfall AB
  • “Hydrogen production and storage” was presented by Nicklas Simonsson, Vattenfall AB
  • “System integration, transition pathways and policy strategies” was presented by Max Åhman, Lund University

The results from the research project are published as articles in the different work packages for RP1. When they have passed the due acadecmic examination they are published in our digital research library here at the web.

Other news

2 September 2024

Gunilla Hyllander new General Manager of Hybrit Development AB

The Board of Hybrit Development AB has appointed Gunilla Hyllander as General Manager as of 1 September 2024. Ulf Spolander, who has been General Manager since 1 September 2022, is leaving Hybrit for a new position as senior business developer at LKAB. “I am very inspired and glad for the opportunity to lead this special …

Pilotplant in Winter

27 August 2024

HYBRIT: Six years of research paves the way for fossil-free iron and steel production on an industrial scale

The HYBRIT initiative now presents the results of six years of research in a final report to the Swedish Energy Agency. The report shows that direct reduced iron produced with the HYBRIT process has superior characteristics compared to iron produced with fossil fuels. HYBRIT has applied for and received several patents based on the successful …

14 December 2023

Positive decision on support for LKAB and HYBRIT

The HYBRIT initiative receives support from Industriklivet, the Swedish Energy Agency’s program to support Swedish industry’s transition to fossil-free.